Define the problem
Specific inputs produce sharper pathways. Nothing leaves this browser unless you connect an AI.
Problem type — select all that apply
Measure
Suspected causes — fishbone (6M) categories
What you've tried
Past attempts are classified by intervention strength. Weak interventions that failed steer the recommendations toward stronger system changes.
Improvement pathways
Complete steps 1 and 2, then select Build improvement pathways.
Run chart
Paste data points in time order (comma, space or line separated). Applies run-chart rules: shift (≥6 consecutive points on one side of the median) and trend (≥5 consecutive points rising or falling).
Sigma level
For defect-based measures (errors, missed screenings, denied claims). Uses the conventional 1.5σ long-term shift.
Saved projects
Stored in this browser only. Export to move between devices or share with your team.